Services

Bathroom Remodeling in the Kansas City Area

Fast Guys Remodeling does bathroom remodeling in the Kansas City area, with Blue Springs and the eastern metro as our home ground. We update showers and tubs, install vanities, set tile, replace flooring and improve lighting and ventilation. Tell us what you want to change and we will talk through the options.

Get a quote

We use your details only to answer this request. See the Privacy Policy.

We will call you back at the number you gave.

Shower with marble-look walls, a herringbone floor, a black grab bar and handshower and a patterned tile niche
  • Service areaServing Blue Springs and the Kansas City metro
  • What we doKitchens, bathrooms and finish trades
  • Get startedCall or request a quote online

Bathroom remodeling services we offer

A bathroom remodel can be a new vanity and floor or a full rebuild down to the studs. These are the jobs we take on.

  • Full bathroom remodel

    Demolition, new layout details, waterproofing, tile, vanity, fixtures, lighting and paint, finished with a punch list. Suited to hall baths and primary baths that need everything redone.

  • Shower and tub work

    Replace a worn tub, build a new shower, or update the surround. We prep the space, protect the rooms around it and handle demolition with care.

  • Tile showers and floors

    Walls, floors and niches set on a prepared, waterproofed surface with straight lines and clean grout.

  • Vanities, fixtures and lighting

    New vanity, top, faucet, mirror and lighting, with the plumbing and electrical connections that go with them.

  • Ventilation

    A properly sized exhaust fan vented to the outside, because moisture that stays in the room is what damages bathrooms.

Looking in Blue Springs? See bathroom remodeling in Blue Springs.

Walk-in showers and tub-to-shower conversions

A tub-to-shower conversion replaces a tub with a shower in the same footprint or a slightly larger one. A walk-in shower removes the tub and gives you a low or no-step entry. Both involve the same core work: new waterproofing, a drain that sits in the right place, a valve, and finished walls.

Here are the choices that shape the job:

  • Tiled shower or prefabricated base and surround. A tiled shower gives you more design freedom and takes more time. A prefabricated base and surround goes in faster and has fewer seams.
  • Curb or curbless. A small curb keeps water in the shower and is simpler to build. A curbless entry is easier to step into, but it needs a floor that slopes to the drain, and that can mean changes to the subfloor.
  • Glass. Frameless glass, a framed door or a curtain each change the look, the cleaning and the budget.
  • Bench, niche and grab-bar blocking. A bench and a niche are easier to build in while the walls are open. Blocking for grab bars is cheap to add before the walls close and hard to add later.
  • Drain location. Moving a drain is possible, but it can affect the floor structure below it.

Tell us which one you are considering and we will talk through how it would work in your bathroom.

Tiled shower with a built-in bench, a black rain head and handheld sprayer and a pebble floor

Refresh, shower conversion, full remodel or primary suite: how to choose

Start with how much of the room bothers you. The table shows what typically changes at each level.

OptionRefreshShower or tub conversionFull bathroom remodelPrimary suite
What changesVanity, top, faucet, mirror, lighting, paint, sometimes flooringThe tub or shower area: waterproofing, tile or panels, valve, drain, glassEverything in the room: fixtures, tile, vanity, flooring, lighting, ventilationLarger room with a shower, tub, double vanity and often a closet or layout change
What usually staysTub or shower, layout, wallsVanity, toilet, most of the floorLayout, unless you choose to move fixturesDepends on the plan
DisruptionLow. The room is out of use for a short stretchMedium. The shower is out of use while it is built and curesHigh. The bathroom is out of use for the whole jobHighest. Plan for a second bathroom
PermitOften not needed for cosmetic work. Check your cityOften needed if plumbing movesUsually needed when plumbing, electrical or structure changesUsually needed
Typical durationSet by scope and material lead timesSet by scope and material lead timesSet by scope and material lead timesSet by scope and material lead times

Swipe sideways to see every column.

If the tub leaks, the floor feels soft or you can smell mold, skip the refresh. Those are signs the problem is behind the surface.

Many overruns trace back to a short list of bathroom remodeling mistakes.

Tell us the room and your city.

What drives the cost of a bathroom remodeling project

Cost depends on scope more than on square footage. These are the factors that move a quote up or down.

FactorWhy it matters
ScopeA vanity swap and a full gut are different jobs. The more you change, the more trades are involved.
Plumbing changesMoving a drain, valve or toilet flange adds demolition, floor work and inspections.
Waterproofing and shower buildA tiled shower with a niche, bench or curbless entry takes more labor than a prefabricated unit.
Tile size and patternLarge tiles, mosaics and patterns need more layout time and more cuts.
Fixtures and finishesFaucets, glass, vanities and lighting range widely in price.
Electrical and ventilationNew circuits, a larger fan or ducting to the outside add work.
Hidden conditionsWater damage, soft subfloor or old wiring found after demolition can change the plan.
Permits and inspectionsRequired for many projects and part of the schedule.

Why quotes for the same bathroom can differ

Two quotes can both be honest and still differ by a wide margin, because they price different scopes. One may include a new subfloor, a waterproofed shower and a vented fan. Another may assume the existing floor is fine. Ask each contractor what is included and what is not, and compare the lists before you compare the totals. The scope you agree on should be written down.

How a bathroom remodel runs, start to finish

Most bathroom remodels follow the same order. Knowing it helps you plan around the work.

  1. Talk and walk the room

    We look at the bathroom, ask what bothers you and what you want, and note what is behind the walls where we can see it.

  2. Condition check

    Soft floors, stains, musty smells and old plumbing are noted before a plan is set, because they change the scope.

  3. Plan and selections

    Layout details, fixtures, tile and finishes are chosen. Long-lead items are ordered early.

  4. Scope and price

    The scope you agree on should be written down, with what is included and what is not.

  5. Permits and scheduling

    Many projects need a permit. Dates are set around material arrival and inspections.

  6. Build and walkthrough

    Demolition, rough plumbing and electrical, inspection, waterproofing, tile, fixtures, paint and a final punch-list walkthrough.

PhaseWhat sets the length
Planning and orderingHow fast selections are made and how long fixtures and tile take to arrive
Demolition and rough-inWhether plumbing moves and whether hidden damage is found
Waterproofing and cureThe shower system used and its cure time
Tile and finishTile size, pattern and the number of surfaces
Inspection and punch listCity inspection schedule and the final walkthrough

For more on schedules, read how long a bathroom remodel takes.

Bathroom with a walk-in shower in gray tile, a white shower base, a white vanity and wood-look plank flooring

Ready for step 1? Tell us the room and your city.

Waterproofing, ventilation and what is behind the walls

Most bathroom failures start where you cannot see them. A shower that looks fine can leak behind the tile for years. This is what a sound shower build involves.

  • Waterproofing. A membrane or a waterproof board system covers the shower floor and walls. Tile and grout are not waterproof on their own.
  • Slope and drain. The shower floor must slope toward the drain so water does not sit on the surface.
  • Curb and corners. Curbs, corners and seams are the places that leak first, so they are sealed with extra care.
  • Valve and plumbing. Valves and drains are tested before the walls are closed.
  • Subfloor. A soft or stained subfloor near a tub or toilet is replaced, not covered.
  • Exhaust fan. A fan sized for the room and vented to the outside removes steam. A fan that vents into the attic only moves the moisture.
  • Electrical. Outlets near water need GFCI protection, and fixtures in the shower area must be listed for wet locations.

What happens if water damage is found?

Rot, mold or a soft subfloor is usually found once the old tub or tile comes out. The fix is added to the plan before the new work goes over it. A change order is a written note of the added work, the reason and the cost, agreed before the work continues. Ask any contractor how changes are priced and approved before you sign.

Damaged walls around a tub are repaired with drywall repair before tile goes up. See also: bathroom moisture problems and fixes.

Tub and shower alcove with a sloped ceiling covered in marble-look tile, a recessed niche and a curved rod

Ready to talk it through? Tell us about your project.

Planning checklist before your bathroom remodel

Settle these five things before demolition day.

Permits and inspections

Many remodeling projects need a permit, especially work that changes plumbing, electrical, framing or structure. Rules differ by city, and cosmetic work such as painting is often exempt. Check with the building department before work starts. The permit is pulled by the contractor or by you, so confirm in writing who does it. For Blue Springs rules, see the Blue Springs bathroom page.

  • Living in the house

    Plan for a second bathroom if you have one. If you do not, expect days without a shower and ask how the water will be shut off and when.

  • Material lead times

    Vanities, glass and some tile can take weeks to arrive. Order early so the work does not stall.

  • Decide before demolition

    Fixtures, tile, the shower style and the location of outlets and lighting are easiest to settle while the room is still intact.

  • Dust and access

    Ask how the work area will be protected and how materials will be carried through the house.

Ready to talk it through? Call (816) 267-1660, send the form below or use the contact page.

Where we remodel bathrooms

Fast Guys Remodeling works in Blue Springs, Grain Valley, Lee’s Summit, Independence and across the Kansas City metro. Start with the page for your city.

Fast Guys Remodeling works in Blue Springs, Grain Valley, Lee's Summit, Independence and across the Kansas City metro. See all service areas.

Bathroom remodeling FAQs

Cost and value

How much does a bathroom remodel cost?

It depends mostly on scope. A vanity-and-floor refresh costs far less than moving plumbing, converting a tub to a shower or rebuilding a primary bath. Tile and fixture choices, waterproofing, repairs to a damaged subfloor, new ventilation or electrical and permits all move the price. Published cost guides disagree widely, so ask for a written scope you can compare line by line. Tell us which bathroom and what you want changed and we will explain what moves the number.

Next step: Bathroom remodeling cost and price drivers

Does a bathroom remodel add value to my home?

It usually does, but not dollar for dollar. Remodeling magazine's 2025 Cost vs Value report shows a national average of 80% of cost recouped at resale for a midrange bath remodel. These figures are national averages and not a forecast for your house. Fit the scope to the neighborhood and plan around how long you will stay.

Next step: Bathroom remodeling services

Why are bathroom remodels so expensive for such a small room?

A bathroom concentrates plumbing, waterproofing, tile, electrical and ventilation in very little floor space, and every trade needs skilled hands. Tile labor is slow, waterproofing must be done right, and fixtures and glass are priced per piece. Small rooms also leave less room to work, so tasks take longer per square foot than in a bedroom.

Next step: What drives the price (bathroom remodeling)

Is a bathroom remodel tax deductible?

For a home you live in, generally no. The IRS treats a bathroom remodel as an improvement added to the home's cost basis, which can reduce taxable gain when you sell. Routine repairs and painting are not added. Medical or business use can change the rules, so ask a tax professional about your situation. IRS Publication 523 explains improvements.

Timing

How long does a bathroom remodel take?

A refresh can be quick, a shower or tub conversion takes longer, and a full gut of a primary bath is the longest. Published claims range from about a day to several weeks because scopes differ. Time goes to demolition, plumbing and electrical rough-in, waterproofing and curing, tile and grout, then fixtures, glass and punch list. Ordering vanities, shower glass and special tile early prevents delays. Ask for a written schedule.

Next step: Bathroom remodeling process and timeline

Process and scope

Can you convert my tub to a walk-in shower?

In most bathrooms, yes. The tub is removed, the floor is built so water slopes to a drain, the walls are waterproofed and the shower is finished in tile, a solid surround or a prefabricated base. A tub-to-shower conversion usually fits in the same footprint, but it often involves moving the drain, which is plumbing work. Decide on a threshold height or curbless entry before the work starts.

Next step: Bathroom remodeling shower and tub options

What goes behind the tile in a shower, and why does waterproofing matter?

Tile and grout are not waterproof by themselves. Behind them, a shower typically has a cement or foam backer board and a waterproof layer, either a sheet membrane or a liquid-applied membrane, and the floor slopes toward the drain. If this layer fails, water reaches framing and subfloor and the damage is hidden until it spreads. Ask what system will be used and how it is tested.

Next step: How the work is sequenced (bathroom remodeling)

Should I use porcelain or ceramic tile in a bathroom?

Both work. Porcelain is denser and absorbs less water, so it is a common choice for showers and floors, while ceramic is usually easier to cut and often costs less. What matters more is slip resistance on the floor, the size of the grout lines and correct waterproofing underneath. Ask for the tile's wet-area rating and sample it in your bathroom light.

What changes make a bathroom safer for aging in place?

Common upgrades are a low-threshold or curbless shower, a built-in bench, handheld shower head, grab bars anchored into blocking, a taller comfort-height toilet, brighter lighting and a slip-resistant floor. Grab bars need solid backing inside the wall, so plan them before tile is set. Curbless showers need a recessed floor, which is a structural and plumbing decision. A doctor or occupational therapist can advise on needs.

Next step: Walk-in showers and tub conversions (bathroom remodeling)

Do I need a new bathroom exhaust fan?

If the old fan is noisy, weak or vents into the attic, replace it. The model residential code calls for a bathroom fan sized at 50 cubic feet per minute intermittent or 20 continuous, measured at 0.25 inch static pressure, and for ducting it outdoors rather than into an attic or soffit. Check the code your city has adopted. A good fan reduces moisture that causes mold and peeling paint.

Next step: More on bathroom remodeling: process and timeline

In what order does a bathroom remodel happen?

Typically: demolition, repair of any damaged framing or subfloor, plumbing and electrical rough-in, inspection where required, backer board and waterproofing, tile, grout, vanity and fixtures, glass, paint, then the final punch list. Waterproofing and tile setting need cure time, so the shower is not usable the moment the last tile goes in.

Can I remodel only part of the bathroom, such as the vanity, floor or shower?

Yes. A vanity, mirror, lighting and floor update can be done without touching the tub or shower, and a shower conversion can be done without changing the rest of the room. Plan the whole room first so pieces match, because new flooring runs under the vanity and the shower choice affects tile and glass. Ask whether plumbing or electrical changes are needed.

Next step: Bathroom remodeling scope of work

Permits and rules

Do I need a permit for a bathroom remodel?

Often, if plumbing, electrical, ventilation or structure change, such as moving a drain, adding a circuit or widening a doorway; cosmetic work such as paint is commonly exempt. Rules differ by city. Contact your building department before starting, and confirm in writing who pulls the permit, you or the contractor. An unpermitted job can create problems when you sell or file an insurance claim.

Next step: Bathroom remodeling in Blue Springs

Living in your home

Can I stay in my house during a bathroom remodel?

Yes, if you have another bathroom. If this is your only bathroom, plan for the days when the toilet, sink and shower are out of service, and ask the contractor to schedule the plumbing so the toilet is usable again as early as possible. Expect dust and noise, and expect water shut-offs. Neighbors, a gym membership or a portable unit can cover the gap.

Choosing a contractor

What should a bathroom remodel estimate or contract include?

It should name the scope in plain words, list the fixtures and materials, say who orders each item, state the price and payment schedule, describe how changes are priced and name who pulls the permit. It should also say what is excluded, such as new tile layout changes or subfloor repair, and how a hidden-damage discovery is handled. Avoid a quote that is a single lump-sum line.

Next step: Request a quote

Who does the plumbing and electrical work in a bathroom remodel?

Ask your contractor directly, because it differs: some companies employ the trades, others subcontract plumbing and electrical to qualified tradespeople. What matters is that the person doing the work is qualified for the type of work your city requires, that the permit and inspection cover it and that one person is responsible for the schedule. Get the answer in your contract.

Next step: About Fast Guys Remodeling

What licenses and insurance should a bathroom contractor have?

Ask every contractor for proof rather than a verbal assurance. Missouri and Kansas licensing rules are set largely by cities, counties and trades, so confirm with your building department which licenses or registrations your project needs, especially for plumbing and electrical work. Ask for a certificate of insurance, which comes from the insurer, and check that it is current before work begins.

Next step: How we work with homeowners

Risks and safety

What happens if you find water damage or mold behind the walls?

Work in that area stops until the cause is fixed. Soft subfloor, stained framing or visible mold are common in older bathrooms. The contractor should show you photos, explain the repair and price it in writing before continuing. Small surface mold on non-porous material may be cleaned, while widespread growth or rot is removed and replaced. Plan a contingency for this.

Still have a question? Call or request a quote.

Planning a bathroom remodel?

Tell us what you want to change and what bothers you most today. We will walk through the options.

Tell us about your project

Share the room, your city and what you want changed. We will call you back at the number you gave.

+1 (816) 267-1660
melvin@fastguysremodeling.com

Add details (optional)

We use your details only to answer this request. See the Privacy Policy.

We will call you back at the number you gave.

CallGet a Quote